New Septic System Installation

Contact Us

  •  941-624-7200
  •  

    Mailing Location

    1100 Loveland Boulevard 

    Port Charlotte, FL 33980

The Florida Department of Health in Charlotte County has prepared this packet of materials to help guide you through the permitting process for your new septic system.  By following this information we can expedite the application process. The application package must include:

 1)   APPLICATION FOR CONSTRUCTION PERMIT:  To apply for a septic permit, this application (click on the link) must be completed.  The instruction sheet accompanying this application explains what information is required.  If the property owner is using someone other than himself/herself to apply for the permit, a letter of authorization assigning authority for that person to act on the owner’s behalf is necessary.  Be sure all submitted forms have been signed and dated.  FEES:  The residential application fee is $535.00. If it is determined by this department that a site evaluation is needed, the applicant will be billed an additional $140.00.  If this happens, the department will notify you. 

 2)    SITE PLAN:  The site plan will need to include the information requested at the bottom of the application instruction sheet under ATTACHMENTS. Please note the absence of the required features on all adjoining lots if this is the case.  We cannot assume that the features are not there, and this will delay your permit. You will also need a copy of the legal description or survey for confirmation of property dimensions.  

 3)    FLOOR PLAN:  For residences, a floor plan drawn to scale or showing all dimension, showing the number of bedrooms, all other rooms labeled and the square footage of the living area.  If the residence has multiple units then the number of units and total square footage of living area must be shown.  For non-residential establishments, we need a floor plan showing the total square footage, a plumbing isometric, and any other information that we need to determine composition and quantity of wastewater.

 4)     ENGINEERS DESIGN:  Charlotte County requires all new construction to be engineer designed.  You are required to have an engineer, who is registered in the State of Florida submit signed and sealed detailed system construction plans for the septic system.  Upon request, we can provide you a list of engineers that have experience providing this service in Charlotte County. Engineering Firm List

 5)      SURVEY:  A copy of the survey must be included as part of the application package.

Please Note:Charlotte County cannot accept documents any larger than 11” x 17”

If you have any questions regarding the application procedure or completing the application, please contact us at 941-624-7200 x 7387.

Once a complete application package (including the fee) has been received, the department will process the application and issue the permit.  You will be notified by telephone when the permit has been issued. If there is additional information required before a permit can be issued, you will receive an email or letter detailing what that information is.

Please contact the Department of Health in Charlotte County if you have any questions.